Warning, Connection and testing – Schwank Parasol Series Post Mount User Manual

Page 11

Advertising
background image

4SN/L5,4BN/L6 Manual

IM080630

RD: JUNE 2008

RL: 1A

BA

LEAK TEST:

This heater must only be serviced by a trained gas service technician. Failure to comply could result in
personal injury, death, fire and/or property damage.
Now that the heater is assembled, for safety a leak test of all connections and hoses must be
performed.

Mix equal parts of water and soap, apply mixture liberally to all gas connections.

1. Ensure that the heater gas control knob is fully closed by turning
completely clockwise.
2. Open the gas supply valve
3. Apply the soap solution generously to all connections and hoses.

If bubbles are detected, there IS a leak.
Close gas supply valve completely.

Retighten the leaking connection and repeat leak test process, until ALL leaking has ceased, no
matter how small.
If the leak cannot be repaired permanently, close the gas supply valve completely. A trained gas
service technician must replace any defective part(s).

 Connect the natural gas supply line to the flexible hose at the base of the post as per local or

national gas code.

 A 5”w.c. gas pressure regulator is required (not supplied) after the shut off valve to each

heater or zone.

6. CONNECTION AND TESTING:

Page 8

NATURAL GAS CONNECTION:

PROPANE CONNECTION:

 Connect the propane gas supply line to the flexible hose at the base of the pole as per local

or national gas code.


 A 10”w.c. gas pressure regulator is required (not supplied) after the shut off valve to each

heater or zone.

WARNING

Advertising