Commissioning report – Schwank sportSchwank User Manual
Page 22
sportSchwank Manual
IM080731
RD: July 2008
RL: 01A
BA
COMMISSIONING REPORT
AS PER I&O MANUAL AND LOCAL CODES
CONTRACTOR NAME: ................................................................................DATE................................
ADDRESS:............................................................................................................................................
............................................................................................................................................................
CITY:........................................................................................
PHONE:...................................................................................
CELL: .....................................................................................
JOB SITE......................................................................................................CITY................................
HEATER MODEL NUMBER:................................................................................
HEATER SERIAL NUMBER: ................................................................................
EQUIPMENT HAS BEEN FACTORY FIRED AND TESTED BEFORE DELIVERY, NEVERTHELESS
IT IS NOT A PLUG IN APPLIANCE..IT DOES REQUIRE COMMISSIONING AND FIELD ADJUSTMENTS
TO ENSURE THAT SITE CONDITIONS ARE COMPATIBLE WITH THIS HEATER, AND TO
ALLEVIATE NUISANCE CALL BACKS FOR THE CONTRACTOR, THE FOLLOWING
START-UP NEEDS TO BE COMPLETED BY THE LICENSED GAS INSTALLER.
A CONTRACTOR CALLING FOR TECHNICAL SUPPORT,
MUST PROVIDE FOLLOWING INFORMATION FROM
HIS COMPLETED COMMISSIONING REPORT
ON NEXT PAGE
FAX COMPLETED FORM TO TECHNICAL SERVICES: CANADA - 905-712-8336 USA - 706-554-9390
17. COMMISSIONING REPORT
Page 19
A CONTRACTOR CALLING FOR TECHNICAL SUPPORT
MUST PROVIDE THE INFORMATION FROM THE COMPLETED
COMMISSIONING REPORT (THIS PAGE & NEXT PAGE)