Start-up sheet page 28 – Schwank STSp-USA User Manual
Page 32
SP-MSTP-AU-05A
STS-p Manual
RD: DEC, 2003
RL: 5
KH
22. START-UP SHEET
Page 28
START UP SHEET
INSTALLATION SET-UP
AS PER IOM MANUAL AND LOCAL CODES
CONTRACTOR NAME: ..................................................................................................................
ADDRESS:...........................................................................................................................
...................................................................................................................................
CITY:...............................................................................................................................
PHONE:.............................................................................................................................
CELL: ...............................................................................................................................
JOB SITE....................................................................................................................................
MODEL NUMBER:............................................................................................................
SERIAL NUMBER: ...........................................................................................................
SCHWANK EQUIPMENT HAS BEEN FACTORY FIRED AND TESTED BEFORE DELIVERY, NEVERTHELESS
IT IS NOT A PLUG IN APPLIANCE..... IT DOES REQUIRE START-UP AND FIELD ADJUSTMENTS
TO ENSURE THAT SITE CONDITIONS ARE COMPATIBLE WITH THIS HEATER, AND TO ALLEVIATE
NUISANCE CALL BACKS FOR THE CONTRACTOR, THE FOLLOWING START-UP NEEDS
TO BE COMPLETED BY THE LICENSED GAS INSTALLER.
IF A CONTRACTOR IS CALLING FOR TECHNICAL SUPPORT,
THE FOLLOWING INFORMATION WILL BE REQUIRED
FROM HIS COMPLETED START-UP SHEET.