Quick start-up – Sulky VISION 2 DPB User Manual

Page 49

Advertising
background image

49

1

3

Quick start-up

GB

1)

2)

3)

•

1

1

•

Select the REG (Settings) menu.

•

2

2

•

Program the INDEX that corresponds to the tyres

•

3

3

•

Check that all the parameters have been saved correctly: speed coefficient

and working width

•

4

4

•

Select your fertiliser

,check the belt speed selection (dpa-xlt = medium) and whether or not the reducer will be used.

(Consult the machine’s instruction manual).

•

1

1

•

Select the INFO menu.

•

2

2

•

Select

mode

•

3

3

•

Reset each counter to zero using the

(RTZ) function

•

4

4

•

As soon as the alarm sounds and the bell appears on the screen, select

to find out why.

Select OK to return to the initial screen.

•

5

5

•

Select

if you wish to save your work.

•

1

1

•

Select the EPAN (Spreading) menu.

•

2

2

•

Check that the fertiliser selected is correct.

•

3

3

•

Programme the rate per hectare using the numeric keypad, and press

to confirm.

•

4

4

•

Carry out a flow rate test (see section

“B- Setting the flow rate”).

•

5

5

•

You can adjust your application rate / hectare: select

or

then return to the initial rate by selecting

.

•

6

6

•

You can activate the TRIBORD

or adjust either the right side by selecting

.

or the left side by selecting

.

Return to the same right / left hand application rate by selecting

.

2

Advertising