Vararam G8 Ram-AIR V User Manual
Page 4
Preparing the system for finale installation
Installing the Air meter into the Air box-
Red hoses- you will find the fallowing hoses one 2 inch ( 4 inch ID) one 1 inch (3.5ID for slip fitting
onto MAF meter )
1. Install the air meter directly into the air box neck, counter sink this, we set its length for just this
purpose, it should slide in tight . Put one hose clamp on and tighten, NOTE you will retighten this
later after you heat soak the engine compartment after the installation.
2. One inch long 3.5ID red hose- slide this onto the tail of the air meter. You are using this as a slip fit.
3. Install the 4.0 ID hose with PCV fitting onto the throttle body ( PCV fitting should be at the 11
O’clock position when standing facing the motor.)
Tech note: after installing hose slide the hose clamp as far forward as possible on the throttle body
casting to ensure that there is a smooth transition from the inside of the hose to the throttle body casting.