Installation requirements, Continued) – Rockwell Automation 1397-L11 I/O Expansion Card User Manual

Page 4

Advertising
background image

4

1397 I/O Expansion Card

1397 – 5.19 August, 2000

Installation
Requirements

(continued)

Retaining

Screw

Retaining

Screw

Retaining

Screw

Retaining

Screw

Carrier Shield

3 To remove the carrier shield, remove

the (4) retaining screws and unplug the
ground wire at the Power Supply
Board.

Power
Supply
Board

J17

Connector

J17

Carrier Shield

Advertising