Installation, Sqe test, Power supply – Rockwell Automation 1785-TR10B5 Coax Transceiver for 10BASE5 Installation Instructions User Manual

Page 2: 1785-tr10b5 with cable piercing tap

Advertising
background image

1785-5.17 - January 1999

2

Coax Transceiver for 10BASE5

Installation

SQE Test

The slide switch located beside the three control LEDs is used to activate
and deactivate the SQE test.

Power Supply

The operating voltage (+12 V) is taken from the connected device via the
15-pin Sub-D socket of the AUI interface.

Coupling the Transceivers
with the Coax Cable
(10BASE5)

1785-TR10B5 with cable piercing tap

The vampire terminal consists of these single items:

1 top section

1 socket-head cap screw

1 bottom section

2 contact springs

1 contact needle

SQE-Test
Generator

TX Packet

Detect

Jabber
Protect

Collision

Detect

Collision
Osc.

RX-Data

ENABLE/
DISABLE

DO

CI

DI

Coax
cable

TX

RX

Important: Before placing the transceiver in operation, you should check to

see whether the connected device requires the SQE test to be on
or off.

The distance between two transceivers fitted on the same coax segment
must be at least 2.5 meters.

Advertising