Pin 1, 24v dc, S1 s2 s3, Mobileview terminal connections – Rockwell Automation 2727-MRT5_10_15_20 MobileView Connection Cable Installation Instructions User Manual

Page 8

Advertising
background image

8 MobileView Connection Cable

Publication 2727-IN004C-MU-P

Connecting the MobileView Terminal to the Junction Box

24V D C

ON LY

TER M IN AL IN

R S422 O U T

ETH ER N ET O U T

+24V

GND

ES1+

ES1-

ES2+

ES2-

ED1+

ED1-

ED2+

ED2-

+24V

GND

ES1+

ES1-

ES2+

ES2-

ED1+

ED1-

ED2+

ED2-

7

8

9

4

5

6

1

2

3

.

0

-

ESC

KE TOP

Ru

n

Er

ro

r

Junction Box Cable

24

mm

25 mm ± 0.1

maximum wall

thickness 5mm (0.2 in)

X1/K3

X2/K4

0.98 in ± 0.0039

0.9

4 in

Pin 1, 24V dc

Opening for Jack

MobileView

Connection

Cable

Dust Cover

Use Grounding Screw
to connect Earth
Ground to the Junction
Box.

Junction Box
Cable Wire Tie

10 Base-T
Connection to
Ethernet Network

Junction Box

MobileView Terminal

Typical Control Cabinet

Pin 1, 24V dc

S1

S2

S3

MobileView Terminal
Connections

K1

Safety Equipment

Connections (For

MobileView G750 only)

2 m (6.5 ft)

Cable Clearance on Both Sides of Enclosure Wall

130 mm (5.12 in)

100 mm (3.94 in)

Junction Box

Cable

Connection

Cable

K1

Connection

Advertising