Pin 1, 24v dc, S1 s2 s3, Mobileview terminal connections – Rockwell Automation 2727-MRT5_10_15_20 MobileView Connection Cable Installation Instructions User Manual
Page 8

8 MobileView Connection Cable
Publication 2727-IN004C-MU-P
Connecting the MobileView Terminal to the Junction Box
24V D C
ON LY
TER M IN AL IN
R S422 O U T
ETH ER N ET O U T
+24V
GND
ES1+
ES1-
ES2+
ES2-
ED1+
ED1-
ED2+
ED2-
+24V
GND
ES1+
ES1-
ES2+
ES2-
ED1+
ED1-
ED2+
ED2-
7
8
9
4
5
6
1
2
3
.
0
-
ESC
KE TOP
Ru
n
Er
ro
r
Junction Box Cable
24
mm
25 mm ± 0.1
maximum wall
thickness 5mm (0.2 in)
X1/K3
X2/K4
0.98 in ± 0.0039
0.9
4 in
Pin 1, 24V dc
Opening for Jack
MobileView
Connection
Cable
Dust Cover
Use Grounding Screw
to connect Earth
Ground to the Junction
Box.
Junction Box
Cable Wire Tie
10 Base-T
Connection to
Ethernet Network
Junction Box
MobileView Terminal
Typical Control Cabinet
Pin 1, 24V dc
S1
S2
S3
MobileView Terminal
Connections
K1
Safety Equipment
Connections (For
MobileView G750 only)
2 m (6.5 ft)
Cable Clearance on Both Sides of Enclosure Wall
130 mm (5.12 in)
100 mm (3.94 in)
Junction Box
Cable
Connection
Cable
K1
Connection