Determine mounting order – Rockwell Automation 2093-ASP06 Kinetix 2000 Shunt Module Installation Instructions User Manual

Page 6

Advertising
background image

6 Kinetix 2000 Shunt Module

Publication 2093-IN002A-

MU-P - December 2006

Determine Mounting Order

Mount a shunt module in the order described below, and as shown in the figure.

Module Mounting Order

IMPORTANT

Mount the shunt module to the right of any axis modules (IAM or AM).
However, the eight-axis power rail (2093-PRS8S) requires the shunt module
be mounted in the rightmost slot.

WARNING

To avoid personal injury due to electrical shock, place a slot filler module
(catalog number 2093-PRF) in all empty slots on the power rail.

An unoccupied slot in the power rail will disable the Kinetix 2000 system, but
control ac power will continue to be applied to the power rail.

Power Utilization or Amp Rating

Lowest

Integrated Axis

Module

2093-AC05-MP5

Axis

Module

2093-AM01

Axis

Module

2093-AMP2

Axis

Module

2093-AMP2

Shunt

Module

2093-ASP06

Slot Filler

Module

2093-PRF

Seven-axis Power Rail Module 2093-PRS7 is shown.

Highest

Advertising