Rockwell Automation 2094-BSP2 Kinetix 6000 Shunt Module Installation Instructions User Manual

Page 6

Advertising
background image

6 Kinetix 6000 Shunt Module

Publication 2094-IN004E-EN-P — June 2008

4. Pivot module downward and align the guide pins on the power rail with the

guide pin holes in the back of the module.

5. Gently push the module against the power rail connectors and into the final

mounting position.

6. Use 2.26 N•m (20 lb•in) torque to tighten the mounting screw.

Guide Pin

Holes

Power rail (side view)

in upright vertical position.

IAM, AM, Shunt, or

Slot-filler Module, Side View

(IAM module is shown)

Guide Pins

Pivot module downward

and align with guide pins.

IAM, AM, Shunt, or

Slot-filler Module, Rear View

(IAM module is shown)

Power Rail

Bracket secured

in slot.

IAM, AM, Shunt, or

Slot-filler Module

(IAM module is shown)

Mounting Screw

Bottom front view of

shunt module.

Advertising