Startup/power on, Hardware configuration, Startup/power on hardware configuration – Rockwell Automation 2727-M7P20D1P1, -M7P20D1Q2, -M7P20D1Q3 MobileView Machine Terminal MT750 Quick Start User Manual

Page 18

Advertising
background image

18 MobileView Machine Terminal MT750

Publication 2727-QS003E-MU-P

Startup/Power On

1. Attach the MobileView Connection Cable to the Junction Box Cable as

shown on page 8. Tighten threaded coupling until it is finger tight.

2. Check the MobileView terminal for a start-up screen.

If the start-up screen does not appear, check the 24V dc power source and
cable connections at the Junction Box and MobileView terminal.

Hardware Configuration

1. From the task bar, select Start>Programs>MobileView>MV

Configuration Tool.

TIP

An icon for RSView ME software appears on the MobileView
2727-M7P20D1Q2 and 2727-M7P20D1Q3 start-up screens only.

Advertising