Lifting sling – Rockwell Automation 2500 CENTERLINE MCC Shipping, Handling and Receiving Instructions User Manual
Page 6
 
Publication 2500-IN002A-EN-P—May 2006
6 CENTERLINE® 2500 Motor Control Centers Receiving, Handling and Storing
Lifting Sling
Using a lifting sling is the preferred method for overhead lifting of heavy duty/
export packaged columns, but it may be used for other types of columns. Refer 
to the following procedure.
1.
Place the lifting sling under the shipping platform. Ensure that slack has 
been eliminated and that the lifting sling remains in place under the load.
2.
The spreader bar must have a larger span (overhang) than the motor 
control center load.
3.
Carefully stabilize the motor control center during handling. All rigging 
must be designed to support the load (refer to the packing slip for 
weight) with the appropriate safety factor.
Figure 4 Lifting Sling on a Heavy Duty/Export Packaged
Motor Control Center
Steel Spreader Bar
Steel Spreader Bar
Caution: Sling must be 
placed under skid and 
located at cross member 
of skid.