Lifting sling – Rockwell Automation 2500 CENTERLINE MCC Shipping, Handling and Receiving Instructions User Manual

Page 6

Advertising
background image

Publication 2500-IN002A-EN-P—May 2006

6 CENTERLINE® 2500 Motor Control Centers Receiving, Handling and Storing

Lifting Sling

Using a lifting sling is the preferred method for overhead lifting of heavy duty/
export packaged columns, but it may be used for other types of columns. Refer
to the following procedure.

1.

Place the lifting sling under the shipping platform. Ensure that slack has
been eliminated and that the lifting sling remains in place under the load.

2.

The spreader bar must have a larger span (overhang) than the motor
control center load.

3.

Carefully stabilize the motor control center during handling. All rigging
must be designed to support the load (refer to the packing slip for
weight) with the appropriate safety factor.

Figure 4 Lifting Sling on a Heavy Duty/Export Packaged

Motor Control Center

Steel Spreader Bar

Steel Spreader Bar

Caution: Sling must be
placed under skid and
located at cross member
of skid.

Advertising