Rockwell Automation Single Precharge Contactor Replacement Kit for LiquiFlo 2.0 AC Fr 3 Drive Ass'y User Manual

Page 8

Advertising
background image

8

Instruction Manual D2-8100

Step 8: Reinstall the
Cabling and Precharge
Resistor Wiring

Task

Description
Install the two (2) 29.0 inch long cables per phase from 2A5-7 to 2K4-L1.

Install the two (2) 35.5 inch long cables per phase from 2A5-8 to 2K4-L2 and from 2A5-9 to
2K4-L3.
Reconnect the precharge resistor wiring.

Reuse the existing cables and hardware, and reconnect the cables to the new contactor.

Reconnect the contactor coils A1 and A2, and auxiliary 13 and 14.

A

B

C

D

E

(2) Cables per Phase

P/N 328858-C34

(2) Cables per Phase
P/N 328858-C36

(2) Cables per Phase
P/N 328858-C36

(3) M10 x 30 mm Long Screws
(6) M10 Hex Nuts

17 mm
22 N-m (195 lb.-in.)

Torque

A

D

C

B

E

B

Advertising