Pipefitting project keys – Calculated Industries 4095-C User Guide User Manual
Page 11

12 — P
iPe
T
rades
P
ro
™
Pipefitting Project Keys
Travel
Slope
Of
fset
Angleº
Enters or calculates a linear Slope, Slope Angle,
or Percent Grade. The linear slope is the amount
of "Offset" over 12 inches of "Run." Values may be
entered as:
● a Dimension: A
● an Angle or Degrees: A
● a Percentage (percent grade): 7 A
Once an angle or slope has been entered, consec-
utive presses of A will convert to the remaining
formats listed above.
Take-Out (T.O./Arc) – Used to enter or solve fit-
ting Take-Outs when calculating pipe cut lengths.
Calculates inner, center, and outer arc lengths for
marking field cut fittings.
Calculates or enters the Offset (Rise).
Welder's Gap – Defines the Welder's Gap sub-
tracted from the end to end pipe length calculation.
Default value is 1/8", 0 is a valid value.
Enters or calculates the Run.
Enters or calculates the Travel (Diagonal).