Figure 22, Sample degasser – Metrohm 850 Professional IC Anion MSM-HC - Gradient User Manual
Page 51

■■■■■■■■■■■■■■■■■■■■■■
3 Installation
850 Professional IC Anion MSM-HC HP-Gradient
■■■■■■■■
41
1
2
3
4
Figure 22
Sample degasser
1
Sample degasser input
2
Sample degasser output
3
PEEK pressure screw, long 6.2744.090
4
Connection capillaries 6.1803.040
Connecting the sample degasser
1 Remove and keep 6.2744.220 thread stoppers from the input and
output of the sample degasser.
2 Connect the end of the 6.1803.040 sample aspirating capillary con-
nected to the injection valve with a long PEEK pressure screw (22-3)
to the output of the sample degasser (22-2).
3 Connect 6.1803.040 connection capillary with a long PEEK pressure
screw (22-3) to the input of the sample degasser (22-1).
4 Guide the other end of the connection capillary out of the instrument
through a capillary feed-through.
Caution
If the sample degasser is not used, the input and output must be
sealed with the 6.2744.220 thread stoppers.