Landing gear installation – E-flite Cessna 182 370 ARF User Manual

Page 10

Advertising
background image

10

Landing Gear Installation

Required Parts

Fuselage

Landing gear

Landing gear fairing (2)

10mm x 136mm tape (2)

1. Locate the landing gear. Press the gear into the

slot in the bottom of the fuselage.

Note: The landing gear is designed for smooth

or paved surfaces. It is not recommended for

grass surfaces.

2. Use the 10mm x 136mm tape to attach the

landing gear fairings to the landing gear.

Advertising