Landing gear installation – E-flite Cessna 182 370 ARF User Manual
Page 10
Advertising
![background image](/manuals/590908/10/background.png)
10
Landing Gear Installation
Required Parts
Fuselage
Landing gear
Landing gear fairing (2)
10mm x 136mm tape (2)
1. Locate the landing gear. Press the gear into the
slot in the bottom of the fuselage.
Note: The landing gear is designed for smooth
or paved surfaces. It is not recommended for
grass surfaces.
2. Use the 10mm x 136mm tape to attach the
landing gear fairings to the landing gear.
Advertising