GBC 1064WFC Arctic Titan User Manual

Page 8

Advertising
background image

© 2006 General Binding Corporation

Page 8

INSTALLATION

This chapter describes how to install the machine. There are no operator serviceable parts to the machine other than periodic cleaning.
Refer to the Operator Maintenance chapter.

WARNING:

Do not attempt to service or repair the laminator. Failure to observe this warning could result severe

personal

injury

or

death.

Disconnect the plug from the receptacle and contact your dealer or distributor when one or more of the following has occurred.

The power supply cord or attachment plug is damaged.

Liquid has been spilled into the laminator.

The laminator is malfunctioning after being mishandled.

The laminator does not operate as described in these instructions.

PRIOR TO INSTALLATION

Inspect the package for damage. Shipping damage should be brought to the immediate attention of the delivering carrier.

INSTALLATION

To set up the laminator for the first time:

1.

Place the laminator on a stable flat surface capable of supporting the weight of the machine and any materials. The surface for
the Artic Titan 1040 WF c should be at least 30 inches (0.76 m) high to assure comfortable positioning during operation. All four
rubber support feet should be positioned completely on the supporting surface. The supporting surface may also be large enough
to hold the material to be laminated.

2.

The laminator should be located so that exiting film drops freely to the floor or to a table that is lower than the exit point of the
laminator. Accumulation of laminate immediately behind the laminator as it exits the equipment may cause the film to wrap
around the rollers, jamming the machine.

3.

Avoid locating the laminator near sources of heat or cold. The laminator should not be in the direct path of forced heated or
cooled air.

4.

Connect the attachment plug provided with the laminator to a suitably grounded outlet only.

Advertising
This manual is related to the following products: