When sizing a trunk line, be sure to include all appliances which
will operate simultaneously.(See Table 11)

The gas piping supplying the furnace must be properly sized based
on the gas flow required specific gravity of the gas and length of
the run. The gas line installation must comply with local codes or
in their absence Refer to the latest version of NFPA54/ANSI Z223.1
for US and the latest version of CSA B149.1 for Canada.

Table 11 -

Т¿¬«®¿´Щ¿- Э¿°¿½·¬§ ±º Р·°» Ч² Э«¾·½ Ъ»»¬ ±º Щ¿- Р»® Ш±«® шЭЪШч

0.60 Specific GravityGas)

CFH=

BTUH Furnace input

Heating Value of Gas (BTU/Cubic Foot)

Internal
DIA.

in.(mm)

Nominal
iron pipe
size
in.(mm)

Length of pipe-ft(m)

10

(3.0)

1/2(12.7) 0.622(15.8)

0.824(20.9)

1.049(26.6)

1.380(35.0)

1.610(40.9)

175

120

97

82

73

360

250

200

170

151

680

465

375

320

285

1400

950

770

660

580

2100 1460 1180

990

900

3/4(19.0)

1(25.4)

1-1/4(31.8)

1-1/2(38.1)

20

(6.0)

30

(9.1)

40

(12.1)

50

(15.2)

To connect the furnace to the building's gas piping, the installer
must supply a ground joint union, drip leg, manual shutoff valve
and line and fittings to connect to gas valve. In some cases, the
installer may also need to supply a transition piece from 1/2" pipe
to a larger pipe size.

To avoid possible unsatisfactory operation or equipment damage due
to underfiring of equipment, use the proper size of naturaupropane
gas piping needed when running pipe from the meter/tank to the
furnace.

The gas supply shall be shut off prior to disconnecting the electrical
power before proceeding with conversion

1.Make sure all utilities (gas and electricity) are turned off
2.Remove the furnace front panel
3.Disconnect the gas line from the gas valve
4.Disconnect the wires at gas control.

М± О»°´¿½» С®·º·½»- ©·¬¸ ФР С®·º·½»- Ъ®±³ Щ¿- У¿²·º±´¼æ

See Fig.23.
1.Disconnect all control wires
2.Remove 4 screws holding gas manifold to supporting burner
assembly bracket
3.Slide the manifold (with valve and orifices) out of burners. Be careful
not to damage the assembly.
4.Replace the natural gas orifices with the LP orifices or appropriate
high altitude orifices (refer to Section High Altitude Installation)
5.Re-assemble the gas manifold and re-connect all wires.

М± Э±²ª»®¬ Ъ®±³ Т¿¬«®¿´ ¬± ФР Щ¿- ±² Щ¿- К¿´ª»

1.Remove regulator (gas valve) cover screw
2.Remove regulator adjustment screw (beneath the cover screw)
3.Remove natural gas spring from regulator sleeve.
4.Insert the LP spring included in the conversion kit into sleeve
5.Replace the adjustment screw and adjust the outlet pressure to

10.5 and 10.6 for outlet pressure tap location and pressure measure-
ment)
6.Replace the regulator cover screw
7.Attach the WARNING label (provided in the kit) to the gas valve,
attach small round LP label to the top of regulator cover screw.
8.Fill required blanks in provided conversion label and attach it to
appropriate location on furnace case.

итн Р®±°¿²» Щ¿- Э±²ª»®-·±²

Possible property damage personal injury or death may occur if the
correct conversion kits are not installed. the appropriate kits must be
applied to insure safe and proper furnace operation. all conversions
must be performed by a qualified installer or service agency.

This unit is configured for natural gas. The appropriate manufacturer's
propane gas conversion kit (PRT. NO. 202082290028 ), must be
applied for propane gas installations. High Altitude Installations refer
to the "High Altitude Derate" section for details.

Contact your distributor for a tabular listing of appropriate
manufacturer's kits for propane gas and/or high altitude installations.
The indicated kits must be used to insure safe and proper furnace
operation. All conversions must be performed by a qualified installer,
or service agency.

on/off Lever

Gas Valve

Inlet

Gas Manifold

Burner Orifices