Tweco Merlin 6000 Plasma Cutting CE Slave Power Supply User Manual

Page 22

Advertising
background image

INSTALLATION PROCEDURES

3-6

Manual 0-2603

A-01448

Nut

Star

Washer

Slave Pilot Lead

Pilot Lead

Connection

Figure 3-7 Pilot Lead Connection - Slave

4. Feed the Slave Power Supply power lead through

the boot at the end of the Arc Starter Box.

5. Connect the power lead to the buss bar per the

following procedure:

a. Remove the lock nut and washer from the up-

per bolt.

b. Place the ring lug on the power lead over the

end of the bolt.

c. Re-install the lock nut and washer to secure

the lead.

A-01449

Washer

Lock Nut

Slave Power

Lead

Buss Bar

Figure 3-8 Power Lead Connection - Slave

6. Connect the other end of the Pilot Lead, two wires,

to the Slave Power Supply per the following pro-
cedure:

a. Remove the right side panel from the Slave

Power Supply.

b. Feed the Pilot Lead, two wires, through the

small strain relief at the front panel of the Slave
Power Supply.

c. Remove the nut and star washer on the ground

terminal of the pilot connection inside the
power supply.

Small Strain

Relief

Black Wire

of Pilot Lead

Ground Terminal

Nut

Star Washer

Pilot Terminal

Red Wire

of Pilot Lead

A-01536

Figure 3-9 Pilot Lead Connection at Slave Power

Supply

d. Secure the shield lead (black) to the ground

connection with the nut and star washer re-
moved above.

e. Remove the nut and star washer from the other

pilot connection inside the power supply.

f. Secure the pilot lead (red) to the pilot connec-

tion with the nut and star washer removed
above.

9. Connect the other end of the Power Lead to the

Slave Power Supply per the following procedure:

a. Feed the Power Lead through the large strain

relief at the front panel of the Slave Power Sup-
ply.

b. Remove the lock nut from the power connec-

tion terminal inside the power supply.

Advertising