INSTALLATION PROCEDURES

3-2

Manual 0-2653

C. Options and Accessories

Options and Accessories are packaged separately from the
Power Supply.

D. Unpacking Procedure

1. Unpack each item and remove all packing material.

2. Locate the packing list(s) and use the list to identify

and account for each item.

3. Inspect each item for possible shipping damage. If

damage is evident, contact your distributor before pro-
ceeding with installation.

3.04 Removing Skid

The Power Supply is mounted on the skid with two brackets.
Remove the Power Supply from the skid as follows:

1. Remove the six bolts connecting the brackets to the base of

the Power Supply.

A-01760

Three Bolts

(Each Side)

Shipping Brackets

Shipping Pallet

Figure 3-1 Skid Removal From Power Supply

2. Roll the Power Supply off the skid backwards (rear wheels

first).

3.05 Input Power Connections

The Power Supply accepts input voltages from 380/415V, 50 or
60 Hz, three-phase power.

A. Electrical Connections

The power source must conform to local electric code and the
recommended circuit protection and wiring requirements shown
in Appendix 1.

B. Opening Power Supply Enclosure

The left side panel (viewed from the front) of the Power Supply
must be removed to make electrical connections and to select
the proper input voltage.

WARNING

Disconnect primary power at the source before
assembling or disassembling power supply, torch
parts, or torch and leads assemblies.

1. Remove the eight screws which secure the left side

panel (viewed from the front) to the Power Supply.

2. Loosen the two bottom screws in the slotted holes.

Left Side Panel

Screws

(10 Places)

A-01528

Figure 3-2 Opening Power Supply