07 primary power cable connections, 06 checking input connections – Tweco 6000GST Merlin Plasma Cutting CE Slave Power Supply User Manual

Page 21

Advertising
background image

Manual 0-2653

3-3

INSTALLATION PROCEDURES

3. Pull the top of the Left Side Panel out and then lift up to

remove the panel from the Power Supply.

3.06 Checking Input Connections

The Power Supply is wired to use input voltages of 380/415
VAC. Internal busbars must be checked on the input voltage
terminal board to verify proper installation.

1. Locate the input voltage terminal board on the left side

of the power supply.

Input Voltage

Terminal Board

L1

L2

L3

Busbars

A-01091

Extra Busbar

Storage Location

Figure 3-3 Input Voltage Terminal Board Location

NOTE

Extra busbars are attached (stored) to the top
side of the power transformer assembly.

2. Check the busbar configuration on the input voltage

terminal board . The busbar configuration must corre-
spond with the available line voltage per the following
figure and the label inside the unit:

11

12

L3

13

15

14

6

7

L2

8

10

9

1

2

L1

3

5

4

Busbar Connections

For Input Voltage

Of 380/415 VAC

A-01090

Figure 3-4 Busbar Connections

If necessary, reposition the busbars to correspond to the
available line voltage.

3.07 Primary Power Cable

Connections

WARNING

Disconnect primary power at the source before con-
necting the primary power cable to the power sup-
ply.

The primary power cable must be supplied by the end
user and installed to the Power Supply assembly. Rec-
ommended cable sizes are specified in Appendix 1.

NOTE

Three-phase operation requires a 3-conductor cable
with ground.

1. Route the primary power cable through the strain

relief fitting in the rear panel of the Power Sup-
ply and tighten strain relief screws.

Advertising