Arcmaster 175 te installation – Tweco 175 TE Arcmaster User Manual

Page 24

Advertising
background image

arcmaster 175 te instaLLation

Installation

3-2 Manual 0-5116

Refer to Figure 3-1:
1. Connect end of ground (GREEN or GREEN/YELLOW) conductor to a suitable ground. Use a grounding

method that complies with all applicable electrical codes.

2. Connect ends of line 1 (BLUE) and line 2 (BROWN) input conductors to a de-energized line disconnect

switch.

3. Use Table 3-1 as a guide to select line fuses for the disconnect switch.

Input Voltage

Fuse Size

230V

40 Amps

Table 3-1: Electrical Connections

Fuse size is based on not more than 200 percent of the rated input amperage of the welding power source

(Based on Article 630, National Electrical Code).

Ground Terminal

Primary Power Cable

Line Fuse

Line Disconnect Switch

Ground Conductor

Art #: A-08462_AB

Figure 3-1: Electrical Input Connections

Input Power
Each unit incorporates an INRUSH circuit. When the MAIN CIRCUIT SWITCH is turned on, the inrush circuit

provides pre-charging for the input capacitors. A relay in the Power Control Assembly (PCA) will turn on after

the input capacitors have charged to operating voltage (after approximately 5 seconds)

NOTE

Damage to the PCA could occur if 265 VAC or higher is applied to the Primary Power Cable.

TIG

STICK

230V/25A

175A@20%

-

230V/40A

-

175A@20%

Arc Master 175 TE

13 AWG (1.5mm2)

Model

Primary Supply Lead Size

(Factory Fitted)

Minimum Primary

Current Circuit Size

Current & Duty Cycle

Table 3-2: Primary Supply Lead

Advertising