arcmaster 175 te instaLLation

Installation

3-4 Manual 0-5116

3.07 Setup for Welding

NOTE

Conventional operating procedures apply when using the Welding Power Source, i.e. connect

work lead directly to work piece and electrode lead is used to hold electrode. Wide safety margins

provided by the design ensure that the Welding Power Source will withstand short-term overload

without adverse effects. The welding current range values should be used as a guide only. Current

delivered to the arc is dependent on the welding arc voltage, and as welding arc voltage varies

between different classes of electrodes, welding current at any one setting would vary according to

the type of electrode in use. The operator should use the welding current range values as a guide

then fine tune the welding current to suit the application.

!

WARNING

Before connecting the work clamp to the work and inserting the electrode in the electrode holder

make sure the Primary power supply is switched off.

CAUTION

Remove any packaging material prior to use. Do not block the air vents at the front or rear of the

Welding Power Source.