08 manual arc (stick) setup, Manual arc (stick) setup -5, Installation arcmaster 175 te – Tweco 175 TE Arcmaster User Manual
Page 27
instaLLation
arcmaster 175 te
Manual 0-5116
3-5 Installation
3.08 Manual Arc (STICK) Setup
Figure 3-2: Setup for Manual Arc (STICK) Welding
Manual Arc Sequence of Operation
1. Switch the ON/OFF Switch (located on the rear
panel) to OFF.
2. Connect the earth clamp lead to the Negative
Output Terminal and electrode holder lead to the
Positive Output Terminal. Consult the electrode
manufacture's packaging for the correct electrode
polarity.
3. Plug the Power Source in and switch the power
switch ON.
4. Set the Process Switch to Manual Arc.
5. Set the Weld Current control to the desired welding
current.
6. Switch the ON/OFF Switch (located on the rear
panel) to the ON position. This will immediately
energize the power supply up to the output
terminals and the electrode holder.
7. Commence welding. If necessary, readjust the
Weld Current control to obtain the welding
condition required.
8. After completion of welding the Power Source
should be left turned ON for 2 to 3 minutes.
This allows the fan to run and cool the internal
components.
9. Switch the ON/OFF Switch (located on the rear
panel) to the OFF position.
230V AC POWER SOURCE
Set Welding Current
as specified by the
Electrode Manufacturer.
Set Process Selection
Switch to Manual Arc.
Positive Output
Terminal
(Dinse™ 50)
Negative Output
Terminal
(Dinse™ 50)
Art # A-08668_AB
200A