Quoizel NA1716BN New England User Manual

Package contents, Warnings and cautions, Preparation

Advertising
background image

PACKAGE CONTENTS

Part

A

E

C

G

H

I

J

K

L

M

N

O

P

Q

B

F

D

Description

Lock Washer (for #8-32 Screw)

Hex Nut (for #8-32 Screw)

Lock Washer (for 1/8IP)

Lock Screw

Ceiling Canopy

Wheel Part

Spacer Tube

Center Stem with Hex Nut

Side Rod

Socket Assembly

Shade

Shade Holder

Hex Nut (1/8IP)

Crossbar

Green Ground Screw

Mounting Screw

Mounting Ball

Quantity

1pc

2pcs

2pcs

1pc

2pcs

2pcs

1pc

3pcs

3pcs

1pc

1pc

1pc

1pc

1pc

1pc

1pc

INSTRUCTION SHEET IS NA1716

-

STYLE NUMBER NA1716BN

:

6 CORPORATE PARKWAY
GOOSE CREEK SC 29445
www quoizel com

,

.

.

.

G

H

I

J

K

L

M

O

Q

P

N

1 OF 3

1pc

Revised 2008-11-11

A

B

C

E

D

F

WARNINGS AND CAUTIONS

!

PREPARATION

WARNING:

● Before beginning the installation, turn off electricity at the circuit breaker box or the main fuse box by
switching off the circuit breaker or removing the fuse.
CAUTIONS:
● These instructions are provided for your safety. It is very important that they are read completely before
the installation of your fixture. We strongly recommend that a professional electrician install the fixture.
● Disconnect fixture from the power source before replacing the bulb(s), making sure the bulb(s) had
sufficient time to cool down. DO NOT subject the lamp to any shock while lit as shattering of lamp may
result.

● Before beginning installation of product, make sure all parts are present. Compare parts with package
contents list and diagram above. If any part is missing or damaged, do not attempt to assemble, install or
operate the product. Contact customer service for replacement part.

● Estimated Assembly Time: 30

45 minutes

● Tools Required for Assembly (not included): Flathead screwdriver Phillips screwdriver, pliers, electrical
tape, wire cutters, safety glasses &3, 100 Watt, Type A Medium Base Bulbs.
● Helpful Tools (not included): Wire Strippers.

-

,

-

Advertising