Oil reservoir – Wheatheart Self-Propelled Post Pounder Kit User Manual

Page 25

Advertising
background image

W

HEATHEART

- S

ELF

-P

ROPELLED

P

OST

P

OUNDER

K

IT

4. I

NSTALLATION

T

RAILER

P

OST

P

OUNDER

M

ODEL

4.6. O

IL

R

ESERVOIR

IM12 R3

25

4.6. OIL RESERVOIR

1. Drain oil and remove existing oil

reservoir (not shown).

2. Insert the SP oil reservoir on the

bracket and bolt it in place with four

3/8” x 1” bolts and 3/8” nuts.

3. Align the bracket and tank assembly so

the tank clears the post bin by approxi-
mately 1-7/8” (Figure 4.10).

4. Tack the new bracket on the post bin,

ensure it is even with the bottom and
back end.

5. Make sure the bracket is level and weld

it solid.

Figure 4.10

Note:

Tank hydraulic fittings must face toward the motor mount.

Figure 4.9

SP KIT OIL
RESERVOIR

3/8” NUT

3/8” x 1” BOLT

BRACKET

POST
BIN

1-7

/8”

Advertising