Operating checklist, Figure 3-6 – Great Plains AS20 Operator Manual User Manual
Page 19
Advertising

-
17
4/14/05
Great Plains Mfg., Inc.
Section 3 Basic Operation
AS15 and AS20 Planting System 148-153M
Proper Tracking Of Drill Openers To Coulters
Figure 3-6
12092
Operating Checklist
Check
Reference
“Safety Rules” in this Manual
Section 1
Page 3
“HookUp” &
“
Operating Instructions” in
this Manual
Section 2
Page 8, 10, 11
Tire pressure
Section 2
Page 6
Lubricate the hitch as needed
Section 6
Page 25 - 28
Drill & Hitch; initially and periodically for
loose bolts, pins, and chains.
Operator’s
Manual
Leaks in the hydraulic system
Operator’s
Manual
Adjustments
Operator’s
Manual
Advertising
This manual is related to the following products: