Operating checklist, Figure 3-6 – Great Plains AS20 Operator Manual User Manual

Page 19

Advertising
background image

-

17

4/14/05

Great Plains Mfg., Inc.

Section 3 Basic Operation

AS15 and AS20 Planting System 148-153M

Proper Tracking Of Drill Openers To Coulters

Figure 3-6

12092

Operating Checklist

Check

Reference

“Safety Rules” in this Manual

Section 1

Page 3

“HookUp” &

Operating Instructions” in

this Manual

Section 2

Page 8, 10, 11

Tire pressure

Section 2

Page 6

Lubricate the hitch as needed

Section 6

Page 25 - 28

Drill & Hitch; initially and periodically for
loose bolts, pins, and chains.

Operator’s

Manual

Leaks in the hydraulic system

Operator’s

Manual

Adjustments

Operator’s

Manual

Advertising
This manual is related to the following products: