Folding – Great Plains 2S-2600F Predelivery Manual User Manual

Page 12

Advertising
background image

10

Section 2 Setup

2012-04-04

2S-2600 and 2S-2600F Two-Section Folding Drill 195-201Q

Great Plains Mfg., Inc.

Folding

1.

Park tractor and drill on level ground with tractor trans-
mission in park. Be aware of clearance needed to fold
the drill.

2.

Hydraulically raise openers completely.

3.

Raise drill with transport-lift cylinders until cylinders
are extended completely.

Figure 2-6

Raising Drill for Folding

4.

Slowly supply oil to rod end of fold circuit. Fold drill un-
til both box frames are secured in folding latch.

Figure 2-7

Folding Latch

5.

At front of drill, lock opener frames into road position
as shown in Figure 2-8.

Figure 2-8

Opener Lock Up

17349

17316

15549

6.

At rear of drill, lock opener frames into road position as
shown in Figure 2-9.

Figure 2-9

Opener Lock Up

7.

Rotate cylinder lock channels over rods on both trans-
port-lift cylinders as shown in Figure 2-10.

Figure 2-10

Cylinder Lock Channels Inserted for Transport

8.

Allow transport-lift cylinders to settle against lock
channels.

9.

Before transporting, check that hydraulic cylinders
have settled against the lock channels and are holding
the channels securely.

17353

15552

IMPORTANT: Make sure u-shaped clips in lock chan-
nels clasp cylinder rods securely. Clips must hold
channels in position until cylinders settle against
channels. You may need to adjust a clip by turning the
bolt inside the channel.

Advertising
This manual is related to the following products: