Great Plains 2S-2600 Assembly Instructions User Manual
Page 5
Advertising
4/19/2007
195-298M
Great Plains Mfg., Inc.
5
Installation Instructions
Install the Valve and Finish the Plumbing
Refer to Figure 5
1.
Install the counterbalance valve (12) on the
drill by connecting fitting (10) to tee (11).
2.
Install tee (7), removed in step 3 on page 3,
between fitting (17) and hose (18). This will be
the new pilot line source.
3.
Reinstall the pilot line hose (3) between tee
(7) and elbow (15).
4.
Reinstall hoses (5) and (6) on tee (14).
5.
This finishes the plumbing. Tighten all fittings
and hardware.
Figure 5
Installing the Valve
21797
Advertising