Great Plains 2S-2600 Assembly Instructions User Manual

Page 5

Advertising
background image

4/19/2007

195-298M

Great Plains Mfg., Inc.

5

Installation Instructions

Install the Valve and Finish the Plumbing
Refer to Figure 5

1.

Install the counterbalance valve (12) on the
drill by connecting fitting (10) to tee (11).

2.

Install tee (7), removed in step 3 on page 3,
between fitting (17) and hose (18). This will be
the new pilot line source.

3.

Reinstall the pilot line hose (3) between tee
(7) and elbow (15).

4.

Reinstall hoses (5) and (6) on tee (14).

5.

This finishes the plumbing. Tighten all fittings
and hardware.

Figure 5

Installing the Valve

21797

Advertising