Great Plains VT7300 Soil Conditioner Assembly Instructions User Manual

Great Plains Gardening equipment

Advertising
background image

Assembly Instructions for the Soil Conditioner

Verti-Till

9/23/03

Your semi-mount soil conditioner comes mostly pre-assembled at the factory. To finish

assembly, start by locating your connecting bar bracket [(12) 540-090H] and mount as shown in figure 1
(semi-mount layout). Next find your mounting bracket [(6) 540-084H] and assemble the locking bar
[(15) 540-133D] and pin as shown. Be sure to space them out as shown in figure 1. If assembling with
a ridge splitter see ridge splitter and conditioner attachment layout, and assemble accordingly.

If assembling a soil conditioner only, locate the center turnbuckle mount [(8) 540-086H] on the

frame layout. If assembling a ridge splitter with a soil conditioner locate the center turnbuckle mount
[(1) 540-022H] on the ridge splitter and conditioner attachment layout. Assemble on the Verti-Till as
shown on the accurate layout.

If assembling a soil conditioner only, the slide tube is bolted to the short length. When

assembling the ridge splitter with a soil conditioner bolt to long length. Follow the layouts to complete
the assembly.

Advertising
This manual is related to the following products: