Re-install valve and strainer – Great Plains Ground Drive Fertilizer Pump Yield Pro Planters User Manual

Page 5

Advertising
background image

Great Plains Mfg., Inc.

Installation Instructions

5

04/23/2007

407-149M

Re-Install Valve and Strainer

Refer to Figure 6

20. Select one saved:

STRAINER BANJO LST150-80 MESH
VALVE 1 1/2FNPT BALL POLYPROP

and its interconnecting and outlet fittings.
Select one new:

830-145C

AD 1 1/2MNPT X 1FNPT POLYPROP

and select one new:

830-127C EL 1MNPT X 1HB POLYPROP

The valve assembly attaches to the mount
using two bolts already present in the valve, which
pass through the holes in the short bent end of the
mount.

21. Hand-position valve/strainer assembly

/

to

determine:

• mounting clearance,

• hose clearance,

• operator access,

• clearance for valve operation,

• preferred inlet elbow orientation, and

• clearance for strainer maintenance.

22. Apply pipe sealant to male threads of adaptor

and screw it into the inlet port of valve

. Apply

sealant to the male threads of elbow

and screw

it into adaptor

, adjusting final orientation to

desired angle.

Note: Do not use tape sealant on pipe threads. Tape

fragments will clog strainer and block orifices.

23. Adjust mount

to provide suitable final position

and tighten bolts/nuts installed in Step 19.

24. Loosen nuts

on mounting side of valve

and

remove bolts

, noting placement of washers.

Position valve on mount

, re-insert bolts, washer

and nuts, and tighten.

25. Re-connect fertilizer feed line hose (not shown)

and secure with clamp

(not shown).

U

D

F

B

L

R

Figure 6

Re-Install Valve and Strainer

25306

26

27

21

1

2

70

67

70

67

27

26

15

67 70

27

67

26

27

15

1

67

2

15

56

Advertising