Transport carrier assembly, Installing marker hydraulics, Assembly – Great Plains 24 Series Drills Assembly Instructions User Manual

Page 2

Advertising
background image

2

24 Series Drills Folding Markers 113-672M

4/9/04

Great Plains Mfg., Inc.

Assembly

Transport Carrier Assembly

Refer to Figure 2.

1.

Assemble transport-carrier mount (1) on drill frame. Center
mount 50 3/8 inches from outside end of drill frame. Use
1/2-by-6 1/32-by-7-inch u-bolts (2), flat washers, lock wash-
ers and hex nuts (3). Slide mount forward so its leading edge
is about 3 15/16 inches ahead of front edge of drill frame
tube.

2.

Bolt transport carrier (4) to transport-carrier mount so top

surface of saddle (5) is about 35 3/8 inches above top of drill

frame tube. Secure transport carrier with 1/2-by-2-by-3-inch

u-bolts (6), lock washers and hex nuts (7).

17629

Figure 2

Transport Carrier Assembly

3.

After installing and bleeding hydraulics, transport carrier
may require further adjustment. When folded, the second
marker section should rest in the transport-carrier saddle
and be parallel with the drill box. Refer to Marker Adjust-
ments
, "Adjustments" in the operator’s manual.

Installing Marker Hydraulics

Without Sequence Valve

Refer to Figure 3.

1.

Install elbow fittings (1) in cylinder ports.

2.

At rod end of each cylinder, install an adaptor (2) into elbow
fitting. Install a needle valve (3) in adaptor.

Figure 3

17642

Assemble Needle Valves

3.

Connect hydraulic hoses to fittings and route hydraulic hos-
es to tractor outlets. Route hydraulic hoses through trans-
port-carrier mount at cutout. Use black cable ties to secure
hydraulic hoses to drill frame.

4.

Using orange cable ties, secure a plastic hose holder to
each pair of hydraulic hoses near tractor outlets. See Figure
4
.

5.

Proceed with "Bleeding Marker Hydraulics," page 3.

With Sequence Valve

Refer to Figure 5.

1.

Mount sequence valve (1) on drill using mounting plate (2).
See Figure 5. Bolt plate to inside end of left-hand-box panel
(3) using one 1/2-inch hex bolt (4).

2.

Bolt valve to mounting plate with two 3/8-by-3/4-inch hex
bolts and lock washers (5).

3.

Install elbow fittings in cylinder ports. Discard adaptor fitting
and two needle valves provided in marker kit.

4.

Use hoses provided to connect valve ports to cylinders. Re-
fer to Figure 5 for port connections.

5.

Connect your own hydraulic hoses to ports on front of valve.
Route hoses to tractor outlets.

6.

Using orange cable tie, secure plastic hose label to hydrau-
lic hoses near tractor outlets. See Figure 4.

17641

Figure 4

Install Hose Label

7.

Proceed with "Bleeding Marker Hydraulics," page 3.

Advertising