Figure 4, Figure 5, Chain routings – Great Plains 3S-4000 Assembly Instructions User Manual

Page 3

Advertising
background image

7/22/10

195-231M

Great Plains Mfg., Inc.

3

Installation Instructions

14. Route chain provided in kit over jackshaft

drive sprocket and gearbox input sprocket
(18). Use new idler (20) to remove chain
slack. Refer to Figure 5 for chain routing.

NOTE: You may need to remove links from the
chain.

15. Reroute chain removed in step 1 over gear-

box output sprocket (19) and seed-cup
sprocket. Refer to Figure 5 for chain routing.

If your drill is equipped with idlers mounted
behind the frame tube, route chain around
idlers and tighten to remove slack.

If your drill is not equipped with idlers mount-
ed behind the frame tube, go to step 17 on

Figure 4

18380

Idler mount
plate

page 4 to install idler mount plate shown in
Figure 4.

16. Refer to Figure 3 and assemble new gearbox

cover (24) on gearbox using two 3/8-inch,
self-tapping screws (25).

17. Assemble gearbox handle (26) onto gearbox

with 1/4-inch bolt, lock washer and flat wash-
er.

NOTE: On center box frame use existing gearbox
handle.

18. Attach brass tags removed in step 2 to new

gearbox covers.

Figure 5

Chain Routings

18399

Advertising