Great Plains 3PYP-24TR40 24 Twin Row 40-Inch Quick Start User Manual

Page 2

Advertising
background image

Quick Setup Guide for IntelliAg Model 3PYP 24 Row Twin Row

11001-1425D-201209

©2012 DICKEY-john Corporation
Specifi cations subject to change without notice.

TABLE C:

Planter Control

Setup

Default Value/

Value to Enter

Instructions/Defi nitions

Type

Planter Control

Set desired Channel Type as Planter Control.

Material Name

Displays only materials that have been confi gured for the channel type.

Control Mode

AUTO

Auto is used in normal operating conditions calculating the rate of how the

system is running. Manual mode acts as an override if application rate

sensors are inoperable allowing the use of increase/decrease buttons to

set the fl ow rate for the control. Refer to System Confi guration section of

Operator’s manual for additional information.

Drive Type

PWM

A hydraulic valve varies the oil fl ow to the motor proportioned to the electric

current supplied.

Drive Frequency

100 Hz

If not using a DICKEY-john supplied valve, see the manufacturer’s specifi -

cations for drive frequency.

Input Filter

50

Feedback frequency fi lter for the control channel. DO NOT CHANGE.

Gear Ratio

1.900

Specifys the actual ratio from the feedback sensor to the seed meter shaft

RPM. Number of revolutions the feedback sensor turns in relation to one

revolution the seed meter turns.

Sensor Constant

360

Sensor Constant establishes the number of pulses for one revolution of

the feedback sensor. If a DICKEY-john application rate sensor is used, the

value should be set to 360.0.

# of Seed Rows

24

Entry of a specifi c number of seed rows for the control channel. Row

assignment is given a priority based on the channel and will be assigned

sequentially thereafter. Channel 1 is always assigned to the fi rst set of

rows, Channel 2 next set of rows, and so on.

Channel Width

480

Manual entry of the channel width for rows assigned to a specifi c channel.

Width calculation can be determined by # of planter rows assigned to the

channel multiplied by the row spacing.

Precharge Time

+ 0.0

Typically used during startup conditions in the fi eld, a Precharge time is

a specifi ed length of time a control channel will operate at the defi ned

Precharge Ground Speed. Must be entered as a positive (+) number.

Delay Time

- 0.0

Length of time before the control channel will start after the master switch

has been turned ON and the implement switch is in a lowered position.

Must be entered as a negative (-) number.

STEP 6A: Planter Control Channel Setup
(Controlled Hydraulic Drive)

At the Control Setup screen, press the Channel Setup button

.

Select Channel 1 and verify that the channel is set to Planter Control.

Enter desired values using Table C as reference.

After planter control setup, calibrate hydraulic valve by pressing the

Valve Cal button

.

Ensure implement is raised. With brakes locked and transmission in
PARK position, start engine.
Engage hydraulics and run engine at normal speed until hydraulic fl uid is
at operating temperature.
Verify point row clutches are turned ON.
Do NOT perform this step unless meters are installed in all loca-
tions across planter row units or drive damage will occur.
Press the START button

. Turn the master switch to the ON

position. The valve calibration will immediately start. Keep the hydraulics
engaged until the calibration completes.

When the screen indicates calibration is complete, press the Channel
Setup button

to return to Channel 1 home screen.

Turn the master switch OFF.

To set up additional control channels (planter or fertilizer control), press

the Next Channel button

.

Press the Work Screen button

when channel confi gurations are

complete to return to the Main Work screen.

Once a control channel has been established as Planter Control, any new
materials established as Planter Control on the Material Setup screen will
automatically be added as optional materials for Planter Control channels on
the Control Setup screen.

1.

2.

3.

4.

5.

6.

7.
8.

9.

10.

11.

12.

STEP 5B: Material Confi guration Setup (Ground Driven
Metering)

For Ground Driven Metering, all control channels MUST be disabled and
the Monitor Only feature selected at the Control Setup screen.
NOTE: A Material Name must also be selected at the Row Monitor Setup
screen to activate high and low population alarms.

At the Main Menu screen, press the Control Setup button

.

Select and press one of the Material buttons (Material 1-16).

Enter desired values from Table B2.

Press the Control Setup button

to return to Control Setup screen.

Press the Channel Setup button

to proceed to Channel Setup

screens and disable any active channels (Step 5B).

1.
2.

3.

4.

5.

TABLE B2:

Material Setup

Default Value/

Value to Enter

Ground Driven Metering

Instructions/Defi nitions

Type

Monitor Only

Desired type of application control channel being used for a specifi c

material.

Units

Ks/Ac

S/Sec

Automatically changes with the type of material application selected.

Changes units for target application.

Target Population

Desired rate of application

High Pop Alarm

Warns of a high population problem. Values are % based.

Low Pop Alarm

Warns of a low population problem. Values are % based.

On/Off Pattern

Rows can be automatically turned ON or OFF according to the pattern.

Row Fail Rate

2/1 (2 seeds

every 1 second)

Set to desired number of seeds per second to trigger seed sensor failure

alarm.

STEP 6B: Planter Control Channel Setup
(Ground Driven Metering)

NOTE: When using a ground drive/nonhydraulic application to monitor
population, ALL Control Channels must be disabled and Material Setup
confi gured for Monitor Only. A Material Name must also be selected at
the Row Monitor Setup screen.

At the Control Setup screen, press the Channel Setup button

.

Select Channel 1 and verify that the channel is set to Disabled.

Press the Next Channel button

to change all other control chan-

nels to Disabled.

1.

2.

3.

2

Advertising