Great Plains 4000-3S Assembly Instructions User Manual

Page 4

Advertising
background image

195-308M

2/22/2005

Great Plains Mfg., Inc.

Point-Row Option 2005+

4

Refer to Figure 5

5.

Assemble new 20" hose (12) to filters con-
nected to top-front port on new pressure con-
trol valve. Using tee fitting (13), assemble new
18" hose (14) and one new 72" hose (15) to
bottom port. Using adaptor fitting (16), as-
semble remaining 72" hose (17) to rear port.

6.

Route 72" hoses (15 and 17) from new pres-
sure control valves back along top of drill
frame.

7.

Connect short hoses to new block. Connect
21" hoses to lower-front ports in block. Con-
nect 18" hoses to top-front ports in block.
Connect hoses to block in same order as
valves. (For example, connect hoses from
center valve to center ports in block.)

Figure 5

22960

Advertising