Meter drive alignment – Great Plains PT8030 V1013 Operator Manual User Manual

Page 33

Advertising
background image

31

Section 3 Adjustments

PT6030 and PT8030 Pull-Type Planter 401-032M-A

10/10/12

Great Plains Mfg., Inc.

Meter Drive Alignment
Refer to Figure 3-22.

1.

With the hopper in place loosen the two 5/16-inch
nuts.

2.

Engage the clutch to the meter input shaft.

3.

Align clutch with shaft and tighten 5/16-inch nuts as
specified on the Torque Values Chart, “Appendix,”
page 52.

Figure 3-22

Meter Drive Alignment

16870

Advertising
This manual is related to the following products: