Great Plains P13307 User Manual

Page 37

Advertising
background image

37

Solo

Operating Instructions

5. Servicing and Maintenance

Rear Roll to Mid Roll

1.

Unfold the press unit (all other working
elements should remain in the transport
position).

2.

Remove the depth control rod and the
shim storage tie rod (items 5&2 on
Page 120).

3.

Put the wing circuit into float.

4.

Remove the 6 nuts on the rampoint unit
and the 2 outer rampoint bolts (fold
cylinders).

5.

Disconnect the hydraulic hoses on the
valve block (at ports F01 & FI1).

Pressure may be retained in the
circuit between the valve and the
cylinders. Although it shouldn’t be
necessary to remove the fittings
between the valve and the

cylinders, the de-pressurisation
procedure (page 35) should be
followed before doing so.

7.

Remove the bolts from the lift (rotate)
cylinders on the carriage unit and lower
the upper roll carriageunit to the ground.

8.

Remove the chassis support unit and
reattach the disc gang for safety.

9.

Remove the remaining (rear) lower roll
carriage bolts and lower the roll to the
ground.

10. Remove wear pads for the roll carriage

from the rear position to the mid-mount
position (item 2 on Page 60).

11. Remove the bolts on the rear gang

mounting unit (as seen on Page 82).

12. Close the drawbar cylinder taps.
13. Carefully raise the machine until the

gang unit is clear of the mounting plate.

14. Drive forwards so the machine passes

through the rear gang hole and bolt into
position.

15. Raise the machine and place the rear

gangs into the transport angle setting.

16. Fully raise the machine and put the

maximum amount of shims into the lift

axle rams.

17. Open the drawbar taps and lower the

machine until the front gangs are just
clear of the ground so that the rear
gangs can clear the roll unit.

18. Reverse the machine until the back

gang is clear of the roll unit.

19. Raise the machine, take out the lift axle

shims before lowering the machine
again.

20. Raise the roll carriage unit to the

mounting plate at the mid-mount
position of the machine.

21. Re-insert the depth rod and the shim

storage bar.

22. Bolt on the top cylinder plate.
23. Lift the carriage unit and attach the rams

to the top.

24. Re-route hoses as per revised piping

for mid/rear roll configuration. Utilise the
the hoses from the toolbox (P13640 (3/
8" 1450mm long)) between the junction
and the valve to bridge the gap. Take
care whilst reconecting the hoses to the
valve to put the twin cable-tied hose
into port F01 (rod side) and the single
cable-tied hose into port FI1 (cylinder
side).

25. Fit the rear drawbar (see page 64).

Advertising