Preparation and Setup

Refer to Figure 3

1.

Assemble the solenoid mount (1) onto the center sec-
tion of the boom using the u-bolts and nuts provided.

Refer to Figure 4

NOTE: On the CF600, first install mounting tube (1) be-
tween frame and wet-boom tube. U-bolt solenoid mount
onto the mounting tube.

Refer to Figure 3

2.

Assemble the hydraulic solenoid (2) onto the solenoid
mount (1) with the two 5/16 bolts and nuts provided. If
equipped with the 506-127A Bypass valve option, re-
fer to the "Bypass Valve Assembly Instructions".

3.

Mount the hydraulic elbows (3) onto the inlet and out-
let ports of the solenoid. (If not equipped with Bypass
Valve Assembly 506-127A.)

4.

Use the feed-line hydraulic hoses from your elevator
to supply the hydraulics to the solenoid. Route the hy-
draulic hoses from the hitch, in the left outer frame
channel back to the elevator. Loop the hydraulic hoses
around the outside left portion of the elevator and at-
tach the hoses to the boom carrier to prevent damage
when the elevator is
raised and lowered.
Make sure you leave
enough slack in the loop
around the elevator that
when the elevator is fully
extended, there is
enough slack in the
hose.

5.

Hook the pressure outlet
hose to the “P” port and
the return hose to the “T”
port stamped on the
block. If equipped with a
bypass valve on the so-
lenoid, hook the pres-
sure outlet hose to the
“V2” port and the return
hose to the “V1” port
stamped on the mani-
fold. (With the hydraulic
lever in the forward posi-
tion, the pressure port is
the one with the short
cylinder illustration on
the tractor, and the re-
turn port is the one with
the long cylinder.)