Great Plains Electric Hydraulic Boom Solenoid Operator Manual 1995+ User Manual

Page 15

Advertising
background image

4/17/2003

500-089M

13

Preparation and Setup

Figure 6

Valve Boom Assembly

13928

Refer to Figure 6

1.

The Bypass valve (1) is most easily assembled with
the solenoid valve (2) off of the mounting plate (3). If
the solenoid valve (2) is already assembled, remove it
to assemble the bypass valve (1).

2.

Place the o-rings (4) in the groove around the ports of
the solenoid valve (2).

3.

Assemble the bypass valve (1) onto the solenoid valve
(2) with the four bolts (5) and washers included. Tight-
en the bolts to the correct torque requirement.

4.

Assemble the solenoid valve assembly onto the
mounting plate (3) with the two bolts and nuts provid-
ed.

5.

Connect the bypass valve harness (6) onto the sole-
noids (2). Connect the terminal with the striped white
wire coupled with the black wire and connect it to the
solenoid on the bypass valve (1).

Advertising