7 trailing implements, 8 when driving on the road, 9 parking the machine – Great Plains P18253C Operator Manual User Manual

Page 19

Advertising
background image

19

Simba SL

Operating Instructions

2. Transportation / Installation

2.7 Trailing Implements

2.7.1 Hitching a Press Roll to

the SL

Maximum rear drawbar vertical

loading - 650kg

Ensure the SL is unfolded.

1. Raise machine to add or remove any

shims in the axle cylinder to attain a

suitable height to attach the trailing

press.

2. Reverse the SL up to the press

roll, ensuring that the drawbars are

correctly aligned allowing a slight

clearance to enable the machines to

be coupled together.

3. Attach the hydraulic hoses between

the SL and the press roll.

4. Open the taps on the press roll

drawbar.

5. Raise the press roll drawbar in line with

the SL drawbar clevis.

6. Close the press roll drawbar taps.

7. Reverse the SL and couple the two

machines together.

8. Open the taps on the press roll

drawbar.

9. Fully raise both machines into the road

transport position. Fold the machine(s)

if necessary.

10. Close the taps on the press roll

drawbar.

2.8 When driving on the

road

When driving on the road the machine must

be converted to the transportation position.

When driving on the road, raise

the machine completely to prevent

the working elements dragging on

the ground.

2.9 Parking the machine

In order to avoid damage as a result of

moisture, the machine should be parked, if

possible, indoors or under cover.

When manoeuvring the machine,

pay attention to your surroundings.

Ensure that nobody is in the

manoeuvring area (watch for

children!).

• Park the machine on level and solid ground.

• Fit the wheel chocks.

• Raise the machine and lower the parking

stand.

• Lower the machine to the ground, ensuring

that it is stable.

When parking with the machine

unfolded, ensure that no load is

carried by the Spring Reset tines.

This can lead to breakage of the

points.

• Disengage from the linkage and drive

forward slowly until the tractor is clear.

• Switch off the tractor.

• Disconnect hydraulic lines from the tractor.

Ensure that no fouling occurs

between the SL and the towed

machine.

Any tines on the towed machine

should be adjusted so that they do

not engage the soil (or should be

removed altogether). In instances

where a Simba Great Plains

UniPress is towed behind the SL

the UniPress tine frame should be

removed completely.

Advertising