Meter installation – Great Plains YP1625 Predelivery Manual User Manual
Page 12
Advertising

2005+ YP1225 & YP1625
401-226Q
8/15/2006
10
Meter Installation
Precision Meters
Refer to Figure 4
1.
If not done yet, disengage the drive cou-
pler by pulling out on the pin, twisting it a
quarter turn and resting it in the shallow
slot.
Refer to Figure 5
2.
Attach precision meter to opener.
Refer to Figure 6
3.
Secure the upper latch.
22912
Figure 5
22911
Figure 6
21969
21968
Figure 4
Advertising
This manual is related to the following products: