Secure tubing, Closeout, Maintenance – Great Plains 1005 Assembly Instructions User Manual

Page 7

Advertising
background image

Great Plains Mfg., Inc.

Installation Instructions

7

02/20/2008

151-128M

Secure Tubing

39. When all the coulters have had tubing routed and

attached, begin drawing up the cable ties in stages.

Leave slack for gentle bends at the back of each
grease bank.

Make sure tubing is flat against the tool bar.

Leave slack for gentle bends down to coulters, and
slack for possible future coulter height adjustments.

Closeout

40. At each bank zerk, pump until only grease (and no

air) emerges at the coulter pivot.

There should be minimal resistance until grease
reaches the coulter, and then only modest resis-
tance.

If there is strong resistance, check for defective zerk,
fitting blockage, tubing blockage and grease pump
malfunction.

If resistance suddenly drops, check for tubing leaks
or disconnections.

Maintenance

Coulter Pivot Arms: At Grease Bank

1 zerk each pivot; 1 or 2 banks

Type of Lubrication: Grease
Quantity: 5 pumps or until grease emerges

27150

8

Advertising
This manual is related to the following products: