Bio-Rad Bio-Plex Manager™ MP Software Upgrade User Manual
Page 78
Advertising

7
| Maintenance Routines
76
| Bio-Plex Manager MP Software
Estimated Run Time
10 minutes
To Run the Calibration and Verification Routine
Before you run the Calibration and Verification routine, you must import the
calibration and verification kit information. For more information, see
.
1.
Navigate to the Maintenance view.
2.
In the Select Routine section, select Calibration and Verification from the
Additional Routines dropdown list.
3.
Add 5 ml 70% isopropanol to the appropriate reservoir in the reagent block.
4.
Vortex CAL, VER, Fluidics1, and Fluidics2 each for 10 sec.
5.
Add 6 drops each of CAL, VER, Fluidics1, and Fluidics2 to the indicated wells.
6.
Click Start.
Advertising
This manual is related to the following products: