Install the box to the monorail (mc-fj-_) – Edge Lighting Box Pro Aim MR16 User Manual

Page 3

Advertising
background image

3

Install the Box to the Monorail (MC-FJ-_)

HOUSING
CONNECTOR
(DISCARD)

1

G

1: Remove the Monorail housing connector from the Monorail
Fast Jack housing and discard it.

MONORAIL FAST
JACK HOUSING

BOX HOUSING
CONNECTOR

2: Place the Monorail Fast Jack housing onto the Monorail and
use fingers to tighten the Box housing connector to the Fast
Jack housing. Make sure that the Box housing
connector is not cross threaded.

H

MONORAIL FAST
JACK HOUSING

2

2

Install the Box to Monorail 2 Circuit Connector (M2C-FJ-_)

MONORAIL 2 CIRCUIT
FAST JACK HOUSING

HOUSING
CONNECTOR
(DISCARD)

1

I

1: Remove the Monorail 2 Circuit housing connector from the
Monorail 2 Circuit Fast Jack housing and discard it.

2: Place the Monorail 2 Circuit Fast Jack housing onto the
Monorail 2 Circuit and use fingers to tighten the Box housing
connector to the Fast Jack housing. Make sure that the
Box housing connector is not cross threaded.

J

1

MONORAIL 2 CIRCUIT

MONORAIL

MONORAIL 2 CIRCUIT
FAST JACK HOUSING

BOX HOUSING
CONNECTOR

1

K

#4-40 SET
SCREW

0.05 ALLEN
WRENCH

3

4

CIRCUIT #1

CIRCUIT #2

1
2

N

1
2

N

3: To power the Box from circuit #1, top and bottom
(neutral) rails, tighten the #4-40 set screw on top of the
housing with the 0.05 Allen wrench. Make sure this set
screw connection is very tight.

4: To power the fixture from circuit #2, middle and bottom
(neutral) rails, remove the #4-40 set screw from top of the
housing and tighten it into the side threaded hole with the
0.05 Allen wrench. Make sure this set screw connection
is very tight.

NOTE:

set screw to select a circuit on the Monorail 2 Circuit connector.

To avoid shorting the system, do not use more than one

NOTE:

Do not load either circuit over the maximum system

rating.

Advertising