Edge Lighting Light Channel Trim 1.6 User Manual

Page 2

Advertising
background image

DRYWALL

2.25"

LENGTH OF

THE CHANNEL

DREMEL
MULTI-MAX

D

6" FIXED
JAB SAW

8: Mark the area where the channel will be located on the drywall.

9: Cut out the marked area(s) and install the drywall, using a "Dremel Multi-Max" with the "wood & drywall" cutting bit or a 6"
Fixed Jab Saw.

10: Install & finish drywall.

2

11: Mark the location of the studs to the drywall for future reference.

MARKING

STUD

E

8

11

9

9

12: Connect the red power supply (24VDC+) wires to each red
power wire with a wire nut.

13: Connect the black power supply (24VDC-) wires to each
black power wire with a wire nut.

14: Place the wire nut connections inside junction box.

15: Using the marked locations on the drywall, carefully make a
hole to channel using the provided square drill with counter
sink bit.

16: Secure the channel to the stud and the junction box with the
#6 drywall screws using the provided square recess bit.

F

POWER FEED
JUNCTION BOX

ENDCAP

#6 SCREW

CHANNEL

MARKING

MARKING

SIDE
VIEW

BACK
VIEW

TIGHTEN SCREW TO LOCK

CLIP INTO PLACE

CHANNEL

CONSTRAINT
CLIP (CONSISTS
OF A SCREW,
BASE, WING CLIP,
CAGE NUT,
& HEX NUT)

DRYWALL

AS SCREW IS
TIGHTENED,
CAGE NUT LOCKS
INTO PLACE
CAUSING
THE WING CLIP TO
SECURE TO
THE DRYWALL.

12

13

16

NOTE: If channel does not line up with a stud, use the provided
constraint clip kit to install to the drywall. Refer to diagram to the
right for reference. For alternate installation see “Section Two:
Alternate Installation w/Uneven Studs”
on Page 4.

Advertising