Start-up checklist – Carrier SINGLE PACKAGE ROOFTOP UNITS ELECTRIC COOLING/GAS HEATING 48HJ015-025 User Manual

Page 32

Advertising
background image

START-UP CHECKLIST

MODEL NO.:

DATE:

SERIAL NO.:

TECHNICIAN:

PRE-START-UP:

Ⅺ VERIFY THAT ALL PACKING MATERIALS HAVE BEEN REMOVED FROM UNIT
Ⅺ REMOVE ALL SHIPPING HOLDDOWN BOLTS AND BRACKETS PER INSTRUCTIONS
Ⅺ VERIFY INSTALLATION OF ECONOMIZER HOOD
Ⅺ VERIFY INSTALLATION OF EXHAUST HOOD
Ⅺ VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTRUCTIONS
Ⅺ VERIFY THAT ALL ELECTRICAL CONNECTIONS AND TERMINALS ARE TIGHT
Ⅺ CHECK GAS PIPING FOR LEAKS
Ⅺ CHECK THAT INDOOR-AIR FILTER IS CLEAN AND IN PLACE
Ⅺ VERIFY THAT UNIT IS LEVEL
Ⅺ CHECK FAN WHEEL AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE, AND VERIFY SETSCREW

IS TIGHT

Ⅺ VERIFY THAT FAN SHEAVES ARE ALIGNED AND BELTS ARE PROPERLY TENSIONED

START-UP

ELECTRICAL
SUPPLY VOLTAGE

L1-L2

L2-L3

L3-L1

COMPRESSOR AMPS — COMPRESSOR NO. 1

L1

L2

L3

— COMPRESSOR NO. 2

L1

L2

L3

SUPPLY FAN AMPS

EXHAUST FAN AMPS

TEMPERATURES
OUTDOOR-AIR TEMPERATURE

F DB (Dry Bulb)

RETURN-AIR TEMPERATURE

F DB

F

WB (Wet Bulb)

COOLING SUPPLY AIR

F

GAS HEAT SUPPLY AIR

F

PRESSURES

GAS INLET PRESSURE

IN. WG

GAS MANIFOLD PRESSURE

STAGE NO. 1

IN. WG

STAGE NO. 2

IN. WG

REFRIGERANT SUCTION

CIRCUIT NO. 1

PSIG

CIRCUIT NO. 2

PSIG

REFRIGERANT DISCHARGE

CIRCUIT NO. 1

PSIG

CIRCUIT NO. 2

PSIG

Ⅺ VERIFY REFRIGERANT CHARGE USING CHARGING CHARTS ON PAGES 21 AND 22

GENERAL

Ⅺ ECONOMIZER MINIMUM VENT AND CHANGEOVER SETTINGS TO JOB REQUIREMENTS

----------------------------------------------------------------------------------------

CUT

ALONG

DOTTED

LINE

Copyright 1995 Carrier Corporation

Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.

Book 1
Tab

1a

PC 111

Catalog No. 534-807

Printed in U.S.A.

Form 48HJ-9SI

Pg CL-1

2-95

Replaces: 48HJ-5SI

Advertising