Attaching the cable-management arm retainer, Replacing the rack doors – Dell PowerEdge 2900 User Manual

Page 22

Advertising
background image

20

Rack Installation Guide

Attaching the Cable-Management Arm Retainer

The cable-management arm retainer keeps the cable-management arm in place. To attach the cable-
management arm retainer:

1 Connect the release latch on the cable-management arm retainer to the tab on the outer slide

assembly. See Figure 1-10.

NOTE:

Attach the cable-management arm retainer to the side opposite of where you attach the cable-management

arm (see Figure 1-10).

2 Fold the cable-management arm retainer until it locks into place behind the cable-management arm.

To unlock the cable-management arm retainer:

1 Press the blue button on the cable-management arm retainer while lifting the retainer arm.
2 Rotate the arm of the retainer to an open position.

Figure 1-10.

Cable-Management Arm Retainer

Replacing the Rack Doors

See the procedures for replacing doors in the documentation provided with your rack cabinets.

This completes the rack installation of your system.

1

release latch on cable-
management arm retainer

2

cable-management arm retainer

3

blue button

4

metal tab

1

4

back of system

2

3

Advertising