Dell UPS 5600R User Manual

Page 26

Advertising
background image

26

|

Installation

Remove Jumper if

Installed

Figure 16. REPO Connector

To install the REPO switch:

1

Verify that the UPS is off and disconnected from utility power.

2

Remove the REPO connector from the accessory kit.

NOTE:

Verify that there is no jumper installed in the REPO connector. If a jumper is installed, remove it before

connecting to the REPO port. See Figure 16.

3

Connect the REPO connector to the REPO port labeled “IN” on the UPS rear panel.

CAUTION:

If you are daisy-chaining the REPO function, observe the following connection requirements to

avoid unintentional shutdown of the UPS:

S

The left pin of the REPO port labeled “OUT” on the first UPS must be connected to the left pin of the REPO
port labeled “IN” on the second UPS.

S

The right pin of the REPO port labeled “OUT” on the first UPS must be connected to the right pin of the REPO
port labeled “IN.” on the second UPS.

4

Optional.

If you are daisy-chaining the REPO function with another UPS, you can shut down the

entire system using a single switch.

Connect the second REPO connector to the REPO port labeled “OUT.”

NOTE:

A separate contact must simultaneously cause UPS input AC power to be removed.

5

Connect the switch or circuit to the REPO connector on the UPS rear panel using insulated
0.75 mm

2

–0.5 mm

2

(18–20 AWG) wire.

6

Optional.

If you are daisy-chaining the REPO function with another UPS, connect the REPO port

labeled “OUT” to the REPO port labeled “IN” on the next UPS.

Advertising