High altitude, Main burners – Carrier SINGLE PACKAGE ROOFTOP UNITS 48PG20-28 User Manual

Page 51

Advertising
background image

51

4. Set main gas valve to ON position.
5. Set thermostat at setting to call for heat.
6. Remove screw cap covering regulator adjustment screw

(see Fig. 40).

7. Turn adjustment screw clockwise to increase pressure or

counterclockwise to decrease pressure.

8. Once desired pressure is established, set unit setting

for no call for heat, turn off main gas valve, remove
pressure-measuring device, and replace

1

/

8

-in. pipe

plug and screw cap.

High Altitude —

For high altitude applications greater

than 2000 ft the heat input rate should be reduced. The higher
the altitude is above sea level, the less oxygen is in the air. See
Table 32 for orifice sizing. A high altitude kit is available to
convert unit for altitudes up to 7,000 ft.

Main Burners —

For all applications, main burners are

factory set and should require no adjustment.
MAIN BURNER REMOVAL

1. Shut off (field-supplied) manual main gas valve.
2. Shut off power to unit.
3. Remove gas section access panel.
4. Disconnect gas piping from gas valve inlet.
5. Remove wires from gas valve.
6. Remove wires from rollout switch.
7. Remove sensor wire and ignitor cable from IGC board.
8. Remove 2 screws securing manifold bracket to basepan.
9. Remove 2 screws that hold the burner assembly to vesti-

bule plate.

10. Lift burner/manifold assembly out of unit.

CLEANING AND ADJUSTMENT

1. Remove burner rack from unit as described in Main

Burner Removal section above.

2. Inspect burners, and if dirty, remove burners from rack.
3. Using a soft brush, clean burners and crossover port as

required.

4. Adjust spark gap. See Fig. 41.
5. Reinstall burners on rack.
6. Reinstall burner rack as described above.

OFF

ON

W-1

W-2

D-1 D-2

C1

C2

PILOT

ADJ.

INLET PRESSURE TAP
(PLUGGED)
1/8 - 27 N.P.T. THDS.

2 LEADS, #18 WIRE 1/32 INSULATION,
600V. MAX., 105

°C

REGULATOR
ADJUSTMENT SCREW
(REMOVE COVER)

OUTLET PRESSURE
TAP (PLUGGED)
1/8-27 N.P.T. THDS.

PILOT CONNECTION
FOR 1/4” O.D. TUBING
(PLUGGED)

RECEPTACLE AND
TAB COMBINATION
TERMINAL

RECEPTACLE TERMINAL

Fig. 40 — Gas Valve

SEE DETAIL “C”

Fig. 41 — Spark Gap Adjustment

Advertising