Unit start-up checklist, I. pre-start-up, Ii. start-up – Carrier SINGLE PACKAGE ROOFTOP UNITS 48PG20-28 User Manual

Page 64

Advertising
background image

Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.

PC 111

Catalog No. 534-80211

Printed in U.S.A.

Form 48PG-10SI

Pg CL-1

9-05

Replaces: New

Book

1

4

Tab

1a 6a

Copyright 2005 Carrier Corporation

-

--

------

-----

------

-----

------

-----

------

------

-----

------

-----

------

-----

------

------

-----

------

-----

------

-----

------

-----

---

---

------

-----

------

-----

------

-----

------

----

------

------

-----

---

CUT

AL

O

N

G

D

O

T

T

E

D

L

INE

CUT

AL

O

N

G

D

O

T

T

E

D

L

INE

UNIT START-UP CHECKLIST

MODEL NO.:___________________________________________

SERIAL NO.:______________________________________________

DATE:_________________________________________________

TECHNICIAN: ____________________________________________

I. PRE-START-UP:

VERIFY THAT ALL PACKING MATERIALS HAVE BEEN REMOVED FROM UNIT

VERIFY INSTALLATION OF OUTDOOR AIR HOOD

VERIFY INSTALLATION OF FLUE EXHAUST AND INLET HOOD

VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTRUCTIONS

VERIFY THAT ALL ELECTRICAL CONNECTIONS AND TERMINALS ARE TIGHT

VERIFY GAS PRESSURE TO UNIT GAS VALVE IS WITHIN SPECIFIED RANGE

CHECK GAS PIPING FOR LEAKS

CHECK THAT INDOOR-AIR FILTERS ARE CLEAN AND IN PLACE

CHECK THAT OUTDOOR AIR INLET SCREENS ARE IN PLACE

VERIFY THAT UNIT IS LEVEL

CHECK FAN WHEEL AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE, AND VERIFY SETSCREW

IS TIGHT

VERIFY THAT FAN SHEAVES ARE ALIGNED AND BELTS ARE PROPERLY TENSIONED

VERIFY THAT SCROLL COMPRESSORS ARE ROTATING IN THE CORRECT DIRECTION

VERIFY INSTALLATION OF THERMOSTAT

VERIFY THAT CRANKCASE HEATERS HAVE BEEN ENERGIZED FOR AT LEAST 24 HOURS

II. START-UP

ELECTRICAL

TEMPERATURES

PRESSURES

VERIFY REFRIGERANT CHARGE USING CHARGING CHARTS ON PAGE 50

GENERAL

ECONOMIZER MINIMUM VENT AND CHANGEOVER SETTINGS TO JOB REQUIREMENTS

SUPPLY VOLTAGE

L1-L2

L2-L3

L3-L1

COMPRESSOR AMPS — COMPRESSOR A1

L1

L2

L3

— COMPRESSOR A2

L1

L2

L3

— COMPRESSOR B1

L1

L2

L3

SUPPLY FAN AMPS

L1

L2

L3

OUTDOOR-AIR TEMPERATURE

F DB (Dry Bulb)

RETURN-AIR TEMPERATURE

F DB

F WB (Wet Bulb)

COOLING SUPPLY AIR

F

GAS HEAT SUPPLY AIR

F

GAS INLET PRESSURE

IN. WG

GAS MANIFOLD PRESSURE STAGE NO. 1

IN. WG

STAGE NO. 2

IN. WG

REFRIGERANT SUCTION

CIRCUIT A

PSIG

CIRCUIT B

PSIG

REFRIGERANT DISCHARGE CIRCUIT A

PSIG

CIRCUIT B

PSIG

Advertising